Installation guide VAQBefore installing read this guide first
Connecting tank• N.B. Do not switch on the Quooker until the tank is filled with water.• The Quooker tank is supplied with a 3-core mains cord with ea
Disconnecting the tank1 23 41 Switch offSet the power switch off and removethe plug from the outlet.2 DrainingOpen the Quooker tap and leave thewater
Q U O O K E R U K L T D 3 Waterpark Hall Montpellier Mews Salford M7 4ZY (UK)P +44 (0)207 9233355 F +44 (0)207 9001590 Internet quooker.co.uk E-mail i
The operation of the QuookerThe Quooker system consists of a small tank under the sink which is connectedto the boiling-water tap. This tank is connec
Technical specificationsTanktype PRO3-VAQ PRO7-VAQVoltage 230 V 230 VWattage 1600 W 3000 WCapacity 3 litres 7 litresHeating-up time cold tank 10 mins.
12341. Quooker tank2. Quooker tap3. Quooker inlet combination4. Quooker drill bit, fibre rings, PVC nipple and drain hose5. Quooker brochure6. Install
It is recommended that you install the Quooker in the following order:A. Drill holeB. Fit tapC. Connect waterD. Connect drainE. Connect tankOverview o
Drilling hole• The tap should be located in one corner of the basin(s).• N.B. It must be possible to move the tap outlet freely up and down.When the o
1 Tap throughsinkLoosen the brass sink nut. Clinch theloop in the hose and remove the sinknut and the loose metal ring. Push thetap through the hole i
Connecting water• N.B. The Quooker operates under water supply pressure and must always befitted with the inlet combination (supplied).• The Quooker b
Connecting drainThe Quooker tank releases expansion water via the inlet combination duringheating, this water is being fed into the grey funnel. The f
Kommentare zu diesen Handbüchern